Burra Proposed Drilling Program

Burra Prospect – Cobar Region NSW
Proposed Drilling Program

The historic Burra Copper Mine is 40km east of Cobar and 5 km south of Canbelego and lies within GCR’s 100%-owned Burra Project.
The Burra Project has drill-indicated potential to host deep-seated, Cobar-style mineral systems. Near-surface drill results by GCR at Burra have yielded similar results to drilling in the early stages of Peel Mining’s Mallee Bull discovery, southwest of Nymagee and comparison can be made by reference to Figures 1 & 2.

Following GCR’s recent successful capital raising, a staged drilling program of up to six holes totalling 2050 metres (RC pre-collars and core) is planned and the planning inputs are discussed below.

121213b

Figure 1. GCR’s Burra Copper Mine Historic Drilling: Upper 200m copper intersections

Click here to download this release in full as a pdf file