New Drill Holes at Copper Hill

  • HIGHLIGHT EXTENSIVE COPPER-GOLD MINERALISATION AT DEPTH
  • EXTEND THE OPEN PIT POTENTIAL AT BUCKLEY’S HILL
  •  LOCATE A NEW 4g/t GOLD ZONE

Assay results from GCHR313 have been received and indicate a large zone of copper-gold mineralisation extending from 25 metres to 695 metres down-hole:

670 metres grading 0.28% copper, 0.28 g/t gold

Using a 0.2% copper cut-off grade, a total of seven separate zones of mineralisation occur within the hole as follows, and shown in Figure 2:

 

  •  70 metres @ 0.56% copper, 1.04 g/t gold from 25 metres
  • 174 metres @ 0.40% copper, 0.40 g/t gold from 121 metres
  • 50 metres @ 0.20% copper, 0.09 g/t gold from 339 metres
  • 62 metres @ 0.28% copper, 0.17 g/t gold from 402 metres
  • 12 metres @ 0.22% copper, 0.11 g/t gold from 498 metres
  • 108 metres @ 0.27% copper, 0.13 g/t gold from 551 metres
  • 20 metres @ 0.24% copper, 0.15 g/t gold from 675 metres

GCHR313 was originally drilled to 260m as a metallurgical sample hole. The hole was extended to 701 metres beneath Copper Hill to assess continuity of the mineralised zone at depth.

Click here to read the release in full

Click here for Chinese version of release