GCHR316 & GCHR318 Latest Metallurgical Holes
confirm and extend higher grade zones at Copper Hill
GCHR316
Bulk interval* 138 metres @ 0.40% copper and 0.68 g/t gold from 13 metres
and, using a 0.2% copper cut-off,
- 79 metres @ 0.56% copper, 0.96 g/t gold from 13 metres including
- 32 metres @ 0.75% copper, 0.99 g/t gold from 13 metres
- 24 metres @ 0.36% copper, 0.4 g/t gold from 114 metres
GCHR318
Bulk interval* 145 metres @ 0.54% copper and 0.46 g/t gold from 25 metres
and, using a 0.2% copper cut-off,
- 8 metres @ 0.61% copper, 0.2 g/t gold from 25 metres and
- 83 metres @ 0.63% copper, 0.65 g/t gold from 81 metres
GCHR316 and GCHR318 were drilled as part of the on-going metallurgical program with four holes testing zones of known mineralisation within the main body of the Copper Hill porphyry deposit.
As with the previously reported metallurgical holes GCHR312 & GCHR313, these results also improve on the previous drilling results.
The holes are not twin holes but were designed to infill and extend known mineralisation. Once again, as the grades encountered are better than expected, these results provide further encouragement for the future of the project.
Read the full release here