Assay results from PQ core hole GCHR315 have been received. At a 0.2% copper cut-off the hole intersected:-
- 21 metres @ 0.3% copper, 0.32 g/t gold from 37 metres,
- 3 metres@ 2.48%copper, 2.36 g/t gold from 82 metres, &
- 25 metres @ 0.26% copper from 105 metres
GCHR315 was drilled as a “scissor-hole” to drill hole CHM18 and to provide metallurgical material from the gold-rich Wattle Hill zone, located 500m southeast along strike from the main Copper Hill deposit.
GCHR315 confirms and extends the intercepts in drill hole CHM18 of 26 metres @ 0.5g/t gold from 2 metres and 20 metres @ 0.32g/t gold from 74 metres.
More assays are expected in due course, from the last 60 metres of GCHR315.
Read the full release here